News Flash

Home

Posted on: February 21, 2018

2018 Storm Culvert Replacement and Terrace Drive Resurfacing

2018 Storm Culvert Replacement and Terrace Drive Resurfacing

2018 Storm Culvert Replacement and Terrace Drive Resurfacing

Construction:  March 2018 – August 2018
Contractor:  Lockhart Concrete Company

A storm culvert on Terrace Drive between Sherwin Drive and Glenwood Drive will be replaced requiring a temporary road closure.  Terrace Drive will then be milled and resurfaced as part of this project.

Facebook Twitter Google Plus Email